11 MW Gas Boiler
Evaporation capacity 5000 lpbs/hr
Certified 21.1.1980 (last certified April 2016)
Upgraded in 2012, new fed pumps and tubes
Design Pres 1100 KPa
Hydrostatic test: 1650 KPa
Work Press: 1034 KPa
Gas Burner - Anderson
No. 80 242
Size: 35 x 10(6) BTU/hr
Physical size: approx 5 m w x 8.5m l x 5m high